Public Works
Engineering
Page Mill Road Tree Survey
Consultant to provide draft report to Town next week.
CIP Projects
East Sunset Drive roadway widening
Contractor is installing concrete laggings retaining wall and will complete by early next week. They will start construct road subbase and asphalt concrete pavement section to widen the road on the week of July 11. Staff anticipates the project complete by end of July 2022.
2022 Pavement Rehabilitation and Drainage Improvement Project
The construction contract for this project was advertised on the Los Altos Crier on July 6. Staff also posted the contract documents on the Town website and notified Builders Exchange and qualified contractors. Bid opening on July 27, 2022, at 2 PM.
Town Hall Addition
Going to Council in August to close project.
Corp Yard Site Improvements
Contract drawings have been finalized, and staff has reached out to several contractors requesting bids. This project falls under the 60,000 to 200,000 threshold and the acquisition plan is based on the Town Bidding procedures 2-4.04 (section b-1) and Public Contract Code section 22032
Correction to last week report, the project only requires a Site Development public hearing, not planning commission. This has been scheduled for July 19.
EVSE Town Hall
The Electrical contractor has made the cut-over for the existing ChargePoint charging station in the Town Hall parking lot on July 8, 2022, and increased charging capacity by 100% with two separate 40-amp circuits. The charging station now draws power from the electrical room in the Town Hall building and relies on renewable energy generated by the Town’s solar panels on the rooftop and in the Native Garden. By increasing demand for power in the electrical room, this allows the Town to take full advantage of free solar energy and reduces back feeding excess solar energy to the power grid. In addition, by switching the power feed away from the Park & Rec building, this will reduce the overall energy bills for the Town, as the electric rates are higher for the Park & Rec building than the Town Hall.
Prop 68 contract award and schedule - Concession Stand at Purissima Park
Contract awarded on May 25, Engineering has drafted a response to address individual comments provided in the second review, and provided design changes as required.
Sewer CIP 2022
Engineering staff has identified twenty critical locations that require immediate attention to prevent sanitary sewer overflow. At eight of these locations, root blockages in the sewer main pipes are over 90%. Staff has prepared a work scope and reached out to a contractor to remove tree roots and clear blockages in sewer mains at these locations.
Sewer root foaming 2022
Staff completed a comprehensive review of sewer maintenance reports for the past four years and identified over 20,000 linear feet of sewer mains for root foaming this year. Roof foaming will stun the growth of protruding roots at sewer joints and reduce the risk of sanitary sewer overflows.
Pathway Projects
2022-23 Pathway Projects
Staff started work on the new approved pathway projects for 2022-23.
Summer Hill Pathway
Staff have selected a designer for this project and will go to Council for approval in August.
Edgerton path
Awarded Lea & Braze design contract to complete Issue for Bid set. Kick off meeting was conducted this week.
Fremont to Redwood Grove Pathway
Los Altos and Los Altos Hills City Managers are discussing the path forward on this project
Page Mill Road Crosswalk at Foothills Park
Palo Alto and Los Altos Hills City Managers are discussing how to move forward on this project
Encroachment Permits Issued: 0
Sewer Permits Issued: 2
Maintenance
After hours or weekend callouts: 0
Fallen trees/major limbs down: 0
Routine Maintenance
- Right of way mowing and brushing on Moody Rd, El Monte Rd, and Magdalena Road, and Bob Stutz Path.
- Removed broken asphalt pathway and replaced with fines to on Fremont Rd near Palo Hills Ln
- Sewer Overflow response on Page Mill Rd
- Small limb down on Page Mill Rd blocking traffic removed
- Purissima Park: mowing, field dragging, arena dragging, and trash pickup.